Overseas Power Projects Pull the Cable Manufacturer Into New Markets
News Details
Overseas Power Projects Pull the Cable Manufacturer Into New Markets
Every cable manufacturer reading this year's half-year filings saw the same line. Overseas revenue rose more than fourfold, led by storage, solar, wind and substation work across the Middle East and North Africa.
A Fourfold Jump in Overseas Revenue
Qingdao Hanhe Cable, listed in Shenzhen, reported overseas revenue of RMB 423 million for the first half of 2026. That is an increase of 440.90 per cent year on year, and it lifted the overseas share of total revenue from under 2 per cent to 7.38 per cent.
Total half-year revenue reached RMB 5.735 billion, up 24.96 per cent. Power cable accounted for RMB 4.035 billion, more than 70 per cent of the total, up 31.11 per cent. Special cable rose 29.37 per cent, and communication cable and optical fibre cable rose 69.53 per cent.
Those figures matter well beyond one company. They show where demand is moving, and they show which product families are moving with it.
Where the Projects Sit
The overseas orders named in the filing cluster in two regions. They include the DUQM energy storage station and the IBRI energy storage station in Oman, the IBRI3 solar project substation, the Mansuriya power plant conversion in Iraq, the SUEZ substation and the INFINIDY wind project in Egypt, and continuing supply to the PIF6 Khulis 2 GW solar project in Saudi Arabia.
The employers and contractors behind that list are state-owned Chinese engineering groups. In practice, the cable specification follows Chinese or IEC practice, which is a useful detail for any bidder preparing documents.
The work is rarely a single product line either. Storage, solar, wind, substation and plant projects each carry a different mix of voltage classes, so one award can span control cable and high-voltage power cable at the same time.
High Voltage Moves Up the Agenda
Domestic work is pushing in the same direction. On 10 September the same company won a contract worth about RMB 15.21 million for 500 kV cable and associated equipment at the Lingshou pumped storage station in Hebei, including installation.
Pumped storage and grid-side storage consume medium and high-voltage cable in volume. They also tend to specify conductor size, insulation and sheath by standard rather than by catalogue number.
Buyers working at that level should state six items in the enquiry: voltage class, conductor material and cross-section, insulation type, armouring, sheath compound and the applicable standard. A 12/20 kV XLPE insulated power cable order is quick to quote when those six are present and slow when they are not.
Armouring and Installation Conditions
Buried and exposed runs need different answers. Armour protects against mechanical damage in direct burial and in cable trenches, and the choice between steel wire and steel tape follows the tensile load rather than habit.
A buyer weighing that choice can compare the options in a note on armoured electrical cable, which sets out where each type fits and what the installation conditions demand.
Overhead distribution is a separate case again. Aerial bundled cable reduces tree-related faults and short circuits on low-voltage networks, and it often ships in the same consignment as underground cable for a substation project.
A completed 110 kV cable for an urban substation upgrade shows how specification, testing and delivery schedule come together on a project of that size.
Terms, Testing and Shipment
Shenghua Cable Group was founded in 1997 and runs seven production bases with 21 cable plants and more than 600 engineers. Monthly capacity reaches 15 million metres across more than 80 cable series.
The group holds CE, KEMA, TUV and EAC approvals, ISO 9001, ISO 14001 and ISO 45001 certification and a CNAS-accredited laboratory, and tests every batch before release.
Commercial terms are published: minimum order quantities of 300 metres for power cable and 1,000 metres for wire, an 18-working-day delivery lead time, a 30 per cent deposit by telegraphic transfer, and FOB or CIF terms.
For export projects, drum length and packing deserve attention early. Long drum lengths reduce jointing on site, and drum strength matters over a long sea leg followed by inland haulage.
Test certificates, drum tags and a retained sample should be named in the order. They cost nothing at quotation stage and settle questions at the receiving end.